stainless steel Projects
Stair Frame Modification (shortened platform width to better fit the environment)
Stair Frame Modification (shortened platform width to better fit the environment)
Stair Frame Modification (shortened platform width to better fit the environment)
Stair Frame Modification (shortened platform width to better fit the environment)
Stair Frame Modification (shortened platform width to better fit the environment)
Stair Frame Modification (shortened platform width to better fit the environment)
Custom prototype product distribution tank for a vial filling machine.
Custom prototype product distribution tank for a vial filling machine - Progress shot with 1/2" ferrule connections.
Custom prototype product distribution tank for a vial filling machine - Progress shot with custom quick connect fittings.
Panel mount frame for RO (Reverse Osmosis) system
Panel mount frame for RO (Reverse Osmosis) system
Fully threaded inserts for mounting options on Panel mount frame for RO (Reverse Osmosis) system
Dual (vertical) heat exchanger frame.
RO Control panel frame and dual heat exchanger frames in position
RO Control panel frame and dual heat exchanger frames in position
RO Control panel frame and dual heat exchanger frames in position
Close up of welded corner joint on the dual heat exchanger frame.
First delivery of Distillation Frame Stair Platform
Distillation Frame Platform Installation
Distillation Frame Stair Platform
Stair platform railing
Distillation Frame Stair Platform
Distillation Frame Platform Progress
Distillation Frame Platform Progress
Distillation Frame Platform Progress
Distillation Frame Platform Progress
Distillation Frame Platform Progress
Reverse Osmosis System Frame
Reverse Osmosis System Frame
Product Filling Machine Modification
Product Filling Machine Modification
Sealed drain in a cleanroom
Sealed drain in a cleanroom
Orbitec Orbital Welder
Orbitec field weld over cleanroom
Sanitary piping routed through a plenum, dropping into a cleanroom
1in Sanitary tubing installed from Mezzanine, through plenum, and into clean room drop.
1in Sanitary tubing installed from Mezzanine, through plenum, and into clean room drop
Orbitec field weld
Orbitec field weld
Orbitec new valve install
Installed new valve into existing water system
Joint field prep
Walkable floor cover with welded pass through ports.
Walkable floor cover with welded pass through ports.
Frame for Air distribution panels
Air and gas distribution panels
Air and gas distribution panels
WFI and Compressed Air wall transfer plate for clean room.
Frame for a condenser
Frame for Little Giant pump
Column mount frame for heat exchanger
Column mount frame for heat exchanger
Custom CIP carts
Custom CIP carts
Floor passthrough plates
Tandem pumps, piping, and frame for a WFI system
Tandem pumps, piping, and frame for a WFI system
Walkable platform around a WFI tank
Walkable platform around a WFI tank
Contact
Interested in working together? Tell me what you’re looking for and I will be in touch shortly.